The last instalment of the Körschtalbahn’s ‘history’ was so long ago I had to back and read it. I left the line in a bit of a mess, with Deutsche Bahn trying to shut it down and increasing road transport competition.
This is of course a rather typical scenario: so many books on Narrow Gauge history describe it as ‘inevitable’ that this or that railway closed because of “Economics”. Economics has become a dogma, an excuse for anything that corporations and governments want to push through against the will of normal people, but just occasionally, if there’s enough people, and they’re properly organised, they can change things.
Let’s assume this happened. The local government was planning a major road building project, which would cut through the heart of several villages in the Körschtal,Of course, this would render the railway ‘obsolete’. A similar scheme had just finished off the Altensteig line, but whereas the road that replaced that line had crossed the Nagold valley on a graceful viaduct, this plan would mean destroying the historic centre of Wildberg.
Coming so soon after the oil crisis, and at a time when tourism was really beginning to kick off in the Black Forest, the citizens of Wildberg and the Körsch valley revolted and elected a new council opposed to the scheme. Much muttering and negotiating later, the Körschtalbahn, track stock and buildings and the power plants on the river were bought from Deutsche Bahn who valued it at one German Mark: the Tax Department demanded twenty Pfennigs extra.
It was quickly realised that the summer tourist season would contribute the most revenue but also that tourists would be the least inclined to make allowances for the state of the track and overhead wiring. Over the winter of 1979-1980 therefore, passenger trains were replaced by buses and the track was entirely replaced. There was some discussion about making the line diesel operated throughout but this was rejected: oil prices hadn’t settled down yet, and there were plenty of metre gauge trams on the market which would provide a cheap, rapid passenger service. For greater capacity and through trains the newly formed “Körschtalbahn Limited” (KÖB) refurbished their fleet of ageing bogie passenger coaches: these and what freight was still running were handled by a motley collection of diesel locomotives until such a time as the railway could afford more powerful electric rail cars in the mid 1980′s.
By 1985 the line was running several passenger trains a day plus tourist trains in the summer and winter peak seasons: the trams had proved a success, and several new stops had been integrated into the system. The maintenance sheds ad Dachsburg were extended and upgraded to handle major repairs, and a new railcar shed was built in Spitzenwald which could handle day-to-day maintenance on diesel locomotives. I’ll explain why that isn’t pie-in-the-sky in another post.
School traffic provided a regular steady income outside of the holiday season and there was a small but growing number of commuters who had moved out to the Körsch valley and worked in Wildberg, Nagold or even Pforzheim, but the railway was still handling but a tiny percentage of the freight traffic which was booming in the Körsch valley: timber, the traditional staple of the railway was moving to road as fast as the swamills were growing, and as new industries came to the valley they were often adding more and larger trucks to the already congested roads, damaging the very fabric of the villages and driving away tourists.
It was time for the Körschtalbahn to re-enter the freight transport market.